4 tons hour water tube coal fired boiler

4 tons hour water tube coal fired boiler

Coal-fired 4 tons hour water tube coal fired boilers to gas-fired boiler and the basic requirements of a program, the transformation of the basic requirements: 1, the boiler must be carried out in accordance with "Steam Boiler Safety Technology Supervision" and "Hot Water Boiler Safety Technology Supervision" and relevant national technical regulations, construction program should be sent to the local technical supervision departments for approval. 2, to determine the value in use based on the transformation of the boiler has the age and state of the art, taking into account the life expectancy of the boiler. If the boiler use a longer useful life, and the pressure there is a serious corrosion, scaling and overheating phenomena such elements, no transformation of value. 3, boiler walls, chimneys, water supply and air supply, the wind system should remain largely intact. 4, after the transformation of the original technical parameters should be kept constant boiler (operating pressure, temperature, etc.) or the load and to improve the efficiency of the original boiler. 5, after the boiler should comply with national environmental and technical indicators, solve the problem of smoke and dust, meet environmental requirements. 6, when the boiler should try not to change the original pot, and the body is pressed by the original system architecture, covers the smaller the better. 7, rehabilitation programs should be simple, low investment, short construction period and quick, safe and reliable. Second, the transformation method: 1, removal of the original coal-fired boiler slag machine, equipment on coal, dust, chain grate and gearbox. 2, according to the diameter and length of the flame, furnace installation height determining geometric dimensions and the burner. 3, making the furnace, the furnace bottom refractory brick, a semicircular shape. 4, the front arch openings mounted burner nozzle. 5, after that the flame away from the center position of the tube the arch, the arch of the pipe on the basis of the original slope, heightening baffle wall, the protective tube arch. 6, install blast doors. 7, install the induced draft fan drive. 8, the body of the boiler water test pressure 1.5 times the working pressure. 9, the automatic control system installed. Third, the technical proposal: 1, furnace design should consider the flame length and diameter of the flame of the combustion gas, so that the furnace space is filled with the best of the flame, the flame not Wall flush. 2, as the main component of natural gas CH4, H20 generated after combustion, steam share large, so that strong radiation, heating furnace suitably increased to take advantage of the radiation heat transfer, thermal efficiency, reduce the consumption of steel, ensure that the boiler output, and may increase the boiler output. 3, a slight positive pressure within the boiler furnace using a combustion or slightly negative pressure, the sealing performance of the boiler furnace walls to strengthen, not air leakage. 4, due to the smaller excess air ratio of the gas boiler, combustion requires less air flow, coupled with the removal of dust, dust and small flue system, the flue resistance is reduced, a large surplus primer fan flow, using file when the damper plate adjusting the power loss is large, frequency control can be induced draft fan air volume regulation. 5, after the furnace door and see the fire smoke chamber above the chimney, mounted two proof doors, in order to improve the antiknock performance of the boiler. 6, the boiler flue gas the volume of gas in the vapor component is generally 15% to 19%, well above the coal-fired boiler flue gases generated in the water vapor content of 6% by volume or less. Boiler shutdown and startup, due to the low wall temperature of the boiler heating element, when less than less 50 ℃, the flue gas water vapor dew condensation on the wall will, if not removed condensate with the condensate of the contact wall would be C02 acid gas corrosion of furnace wall and the insulation material due to water absorption and thermal insulation effect will be lost. Therefore, before and after the gas hot water boiler smoke box and the rear box and the rear flue smoke condensate discharge means to be provided, promptly boiler condensate removal. 7, the gas boiler-system control function should have combustion process. Pre-blowing may be implemented, auto-ignition, flame detector self-test, automatic load adjustment, flame monitoring, fault alarm interlock shutdown, the gas leak detection valve, induced draft fan and burner control sequential chain protection. 8, in order to prevent fluctuations in the gas pressure regulator to meet the burner requirements, the installation of a gas regulator metering panel outer gas inlet in the boiler room, the surge counter can be accomplished by filtration, regulating, metering, safety shut-off functions.

State all the more attention to environmental protection, to provide more excellent atmosphere, we respond positively to the country's environmental protection, promote the 4 tons hour water tube coal fired boiler from coal to gas project. Among the many boiler suppliers, we chose the fast boiler. First, the party quickly done very well in terms of cleaning the boiler, the second is fast side also very comprehensive after-sales involved. The optional gas boiler was used after running fully meet the needs of our pharmaceutical production, both energy-saving and environmental protection, but also a very high thermal efficiency, saved us a lot of fuel costs. --customer feedback

Main steam 4 tons hour water tube coal fired boiler temperature abnormal phenomenon of how to do 1, main steam temperature anomalies alarm. 2, the rapid variation of the main steam temperature, a secondary damper frequently significantly reducing water operation. 3, starting superheat outlet steam separator above or below normal. 4, if the steam with water, the unit will water shock occurs. 1 reason, the fuel and water supply imbalance, the separator outlet temperature abnormality. 2, coal combustion conditions change or affect, such as excessive load lift; and pulverizing mill administration system abnormality stop; means automatically increase or decrease the failure rate is too large amount of wind and the like. 3, the central flame furnace changes, such as the bottom seal damage, W and inadequate flame downstroke. 4, the control failure by warm water, warm water flow rate reduction is abnormally reduced or increased. 5, feedwater temperature mutation. 6, does not match the wind coal. 7, the secondary combustion heating surface. 8, furnace coking or fouling seriously. 9, heating surface leakage squib. 10, flue gas damper opening degree is not normal. 11, coal sudden change occurred. 12, the uniformity of the powder feeding substantial change occurs. 1 process, failure caused by unit coordinated coal - water ratio should be immediately released coordinate offset, in accordance with the current load demand, with reference to the start of the steam superheat separator, and adjusting the amount of fuel corresponding to the amount of water, with one, two main desuperheating water rapidly steam temperature control in a normal range; when the coal - water ratio should avoid imbalance after coal and water while adjusting; when coal - water ratio is adjusted to further adjust the load after a relatively stable; contact maintenance processing timely. 2, when the water supply system fault condition occurs a significant disturbance furnace should pay attention and automatically coordinated working conditions, so as not to manual intervention, when not working properly coordinated and automated, should be manually adjusted, stable water flow, referring to separation according to the water flow steam superheat, the adjusted amount of fuel, with a secondary spray water rapidly controlling the main steam temperature within the normal range; contact maintenance processing timely. 3, due to rapid changes in load caused by the load change rate should be adjusted; load change caused due to protective operation or the like caused by heat load to be quickly adjusted to maintain the boiler pressure of the main steam stability. 4, by warm water automatic dysregulation, should be appropriate Save warm tone is switched to the manual may be an intermediate point of the feedwater control system be corrected for temperature if necessary, or the feedwater to switch control to manual control, due to lower lifting and lowering the load speed to prevent steam temperature, promptly contact a service process. 5, the boiler furnace cause severe fouling and coking of the main steam temperature anomalies can be corrected by an appropriate degree of superheat outlet steam separator start, adjust, and in a timely manner and the furnace heating surface sootblowing. When the platen superheater sootblowing or superheater outlet temperature is still above normal and a secondary reducing water damper fully open, to check the furnace and the combustion air distribution system is normal, the checking process to reduce still overtemperature unit load. 6, flue gas damper adjusted to an appropriate opening degree. 7, if the bottom seal after losing back to normal immediately. 8, to strengthen the turbine expansion, differential expansion, axial displacement of the shaft vibration and bearing temperature monitoring, if abnormal, the process according to the corresponding regulations. 9, after the above measures, if invalid, should immediately drop the load process. 10, in front of the main steam temperature main steam 50 ℃ drastically reduced within 10 minutes, should an emergency stop.

Vertical steam 4 tons hour water tube coal fired boiler What are the advantages? With the continuous development and progress of science and technology, the boiler applications also become increasingly wide range of vertical steam boiler is not only elegant appearance, small footprint, and low power consumption, strong performance advantage. So what are the advantages of low power consumption vertical steam boiler what else? Let us to understand a small taping, convenient vertical steam boiler ignition bathing water can be discharged outwardly after two minutes a suitable temperature, without pressure, safety, a normally open tube furnace to the atmosphere, does not have any valves, to ensure safe and reliable operation. And interior of the boiler can be extracted within a few minutes, making repairs or updating the boiler is also extremely fast, short, very convenient. Second, clean the inside of the boiler fouling is a killer, many products are not remove fouling or in addition to science is not complete, but the vertical steam boiler manually to complete the removal of internal boiler fouling, will not leave any dead ends. And heating water and bathing water is not mixed with, but also add a water softener water heating cycle intervention, will not make the whole boiler fouling, very clean. Third, energy saving vertical steam boiler when the water temperature of the furnace is low, reduces the heat loss. And the use of advanced environmental protection technology, can completely smoke-free dust-free, high environmental requirements for cities to achieve energy saving effect. During use, does not produce smoke, the onset of gas boilers together as a whole, the fuel on the grate in cast from the incineration stoker opening, using a high temperature steam and coal seam combined and allowed plenty of chemical attack the combustible gas after reaction, multiple backhaul several cycles, using the pipeline full heating surface, the progress of burning thermal efficiency, heat loss can be reduced to a large extent, energy saving. Vertical steam boiler since the sale of the trust of many old and new customers praise the majority of users. Simple vertical steam boiler maintenance is also very simple, and most businesses will be responsible for after-sales maintenance boiler work, professional service staff, so please do not worry, you can rest assured purchase!

4 tons hour water tube coal fired boiler Related Information

4 tons hour boiler economic - Bhai Gurdas

20 tons boiler operate by coal Industrial Coal Fired . 20 ton Industrial Boiler Coal Fuel Economic Benefits. 2019-4-5 · 30 tons per hour of steam boiler is a high capacity steam boiler, SZS series 30 ton steam boilers . Get A Quote

Get a Quote

4 tons natural gas boiler - jmdekoning.nl

4 Ton Gas Fired Boiler Consumption Per Hour-ZB. 2019-4-8 · 4 Ton Gas Fired Boiler Consumption Per Hour. 2017-11-17. gas consumption of 4 tons natural gas fired boiler is 297 cubic meters, of course, this is a basic estimate, because the actual the boiler gas consumption depends on efficiency of boiler operation, the efficiency of gas fired

Get a Quote

1 ton per hour 10 bar boiler Industrial Gas & Oil

Gas & oil fired boiler Harga Miura Boiler 2000Kg 10 Bar Thn 2002 di Kab 250 kg per hour at 7 bar boiler 3 ton Boiler price 250 kg per hour at 7 bar boiler By 3 ton Boiler price 0°C to 100°C Kg/h 2.26MJ/kg Power In kW 1 5 10 15 20 30 40 50 60 70 steam boiler 1-20 ton/hour, ton per hour in boiler Boiler Harmony with

Get a Quote

diesel consumption/hour for a 4 ton steam boiler

2018-3-31 · What is the fuel consumption of a 10,000#/hr steam boiler using diesel as 4 Ton Gas Fired Boiler Consumption Per Hour- BoilerHow much is gas consumption per . fuel consumption of oil fired boiler capacity 2 tons steam per hour . Boiler Company Boiler ⦠High Temperature Low Consumption 2 Ton Diesel Steam Boiler

Get a Quote

4 tons natural gas boiler - jmdekoning.nl

4 Ton Gas Fired Boiler Consumption Per Hour-ZB. 2019-4-8 · 4 Ton Gas Fired Boiler Consumption Per Hour. 2017-11-17. gas consumption of 4 tons natural gas fired boiler is 297 cubic meters, of course, this is a basic estimate, because the actual the boiler gas consumption depends on efficiency of boiler operation, the efficiency of gas fired

Get a Quote

1 ton / hour boiler Industrial Oil Boilers Manufacturers

Steam output = 6 tons/hour. Fuel consumption = 1 ton oil per 13 tons of steam. Fuel costs = Rs.2,000 / ton of waste wood. Boiler thermal efficiency PULVERISED COAL FIRING OF SMALL BOILER Proceedings of The South African Sugar Technologists Association June/July 1975 PULVERISED COAL FIRING OF SMALL BOILER PLANT By A. G. HURTER

Get a Quote

1 ton per hour 10 bar boiler Industrial Gas & Oil

Gas & oil fired boiler Harga Miura Boiler 2000Kg 10 Bar Thn 2002 di Kab 250 kg per hour at 7 bar boiler 3 ton Boiler price 250 kg per hour at 7 bar boiler By 3 ton Boiler price 0°C to 100°C Kg/h 2.26MJ/kg Power In kW 1 5 10 15 20 30 40 50 60 70 steam boiler 1-20 ton/hour, ton per hour in boiler Boiler Harmony with

Get a Quote

Four Tons Of Gas Boiler - Dorfwirt Hagendorf

Four tons of oil hot water boiler price. gas fired 1-4 tons industrial steam boiler. Industrial gas fired Boiler Manufacturer Email:[email protected] Gas oil Fired Boiler 0 3 tons boilers china by Sitong Gas Boiler · Except hot oil boiler, oil gas fired steam boiler and biomass water tube steam boiler is also suitable for textile factories. it .

Get a Quote

1 ton wns fire tube steam boiler - Steam Boiler

3 Ton 1.0MPa Gas Oil Boiler, Fire tube gas oil fired. 2019-4-26 · In this project, the client ordered one set of 3 ton gas oil steam boiler to generate steam for the building materials processing. In addition to the WNS series fire tube gas oil boiler, we also provide SZS series water tube gas oil boiler for customers.

Get a Quote

4 tons natural gas boiler - jmdekoning.nl

4 Ton Gas Fired Boiler Consumption Per Hour-ZB. 2019-4-8 · 4 Ton Gas Fired Boiler Consumption Per Hour. 2017-11-17. gas consumption of 4 tons natural gas fired boiler is 297 cubic meters, of course, this is a basic estimate, because the actual the boiler gas consumption depends on efficiency of boiler operation, the efficiency of gas fired

Get a Quote

4 ton steam boiler price - sp-h-keppler.de

4 ton,steam boiler,Kenya - yd-boiler.com. 2019-10-9 · 4 ton coal fired steam boiler to Kenya. 4 ton 4000kg/h coal fired steam boiler to Kenya Equipment needed:DZH4-1.25-AII Number :1 set Application background:DZH4-1.25-AII is one type of hand fired boiler in China. 4 means the rated evaporation capacity of the boiler is 4ton.

Get a Quote

10 ton coal fired steam boiler with fire tube - Steam

2019-4-8 · DZL coal-fired boiler is composed of the body, chain grate, the former arch and the after arch, light furnace wall, steel frame and insulating layer etc. The 4 ton coal fired boiler for sale is single drum fire and water tube steam boiler. 4 ton packaged coal fired steam boiler structure. Learn More

Get a Quote

Babcock Steam Boiler 1 Ton Hour - meerkotten

steam boiler capacity 0.5 ton hour price Gas Boilers . steam boiler capacity 0.5 ton hour price gasboilersuppliers Gas Steam Boilers April 4, 2019 0 Comment. The series boiler is horizontal 3 pass water fire tube coal fired steam boiler, the capacity is 1-20t/h. thermal efficiency is

Get a Quote

50 Tons Oil And Gas Fired Boiler For Steel - WHGLA

Product 50 tons coal steam boiler for steel plant top . 50 tons coal steam boiler for steel plant top quality . With more than 30 years of manufacturing boilers, the company has formed more than 400 varieties of gas boilers, biomass boilers, coal-fired boilers, heat-conducting oil boilers, etc. Free Chat

Get a Quote

1 ton wood fired steam boiler consumed water in hr

2019-3-29 · 1 ton wood fired steam boiler consumed water in hr. .. to increase, the maximum capacity of the gas-fired boiler is reached, and the coal-fired boilers need. water tube boiler. run on solid fuel like fire wood, coal, bagasse, etc. fired boiler having steam generating capacity of 90 tons/hr. Working pressure of steam average quantity of

Get a Quote

Do You Want To Get An Exclusive Project Plan ?

7 * 24 * 365 endless service, click the button to provide you with professional and fast solutions at any time

Scroll to Top